Radioflyer97 10+ year member
C.E.O.
still in progress. estimated completion date is Friday 1-19
here are the pics:
sketch:
the toys:
plexi lit up with cathode:
lid:
second layer wiring for RCAs:
test fit:
crossover layout:
test fitting amps:
power/ground distribution on lower level:
carpeted:
here are the pics:
sketch:
the toys:
plexi lit up with cathode:
lid:
second layer wiring for RCAs:
test fit:
crossover layout:
test fitting amps:
power/ground distribution on lower level:
carpeted: